Design and installation using 3D

During design and installation, we use materials scanned by a laser scanner, which minimizes network conflicts during installation on site

We integrate into your IHP (individual heating unit) -

modern equipment that can keep the

consumption of traditional heat

Design and installation using 3D
During design and installation, we use materials scanned by a laser scanner, which minimizes network conflicts during installation on site

We integrate into your IHP (individual heating unit) -

modern equipment that can keep the consumption of traditional heat

Water supply / plumbing
Electricity

Ventilation

Heating / air conditioning

Water supply / plumbing
Electricity

Ventilation

Heating / air conditioning

Our advantages

Save time

Due to 3D measurements, installation time is reduced

Saving materials

Laser 3D scanning minimizes material rejects during installation

Modern equipment

We know and use modern heat pumps, recuperators, renewable / alternative energy sources

Experience

We have extensive experience and a lot of satisfied customers, more than 500 projects have been completed

Positive findings

Exceptionally positive conclusions of the Expertise

Employees

All employees are certified. There is a certified road engineer

Our advantages

Save time

Due to 3D measurements, installation time is reduced

Saving materials

Laser 3D scanning minimizes material rejects during installation

Modern equipment

We know and use modern heat pumps, recuperators, renewable / alternative energy sources

Experience

We have extensive experience and a lot of satisfied customers, more than 500 projects have been completed

Positive findings

Exceptionally positive conclusions of the Expertise

Employees

All employees are certified. There is a certified road engineer

The 3D survey made it possible to take into account all the landing heights and places of the old equipment, the equipment was being prepared and was brought for installation ready-made.

3D survey showed the exact place of entry / exit of existing communications, taking into account the irregularities of all structures. The same shooting was used later by the designer.

The 3D survey made it possible to take into account all the landing heights and places of the old equipment, the equipment was being prepared and was brought for installation ready-made.

3D survey showed the exact place of entry / exit of existing communications, taking into account the irregularities of all structures. The same shooting was used later by the designer.

We carry out projects:

  • curtain / glass facades
  • heating networks
  • water supply
  • electricity
  • conditioning
  • certification and thermal audit of buildings
  • design of roads, sidewalks, traffic management (ODR-organization of road traffic)
We carry out projects:
  • curtain / glass facades
  • heating network
  • water supply
  • electricity
  • conditioning
  • certification and thermal audit of buildings
  • design of roads, sidewalks, traffic management (ODR-organization of road traffic)

Vacancies

We invite designers, welders and installers to work and cooperate

Vacancies

We invite designers, welders and installers to work and cooperate

Our partners

Our partners
FAQ
FAQ

What kind of work experience do you have?

We have over 15 years of experience behind us in this field. You can rest assured of our professionalism.
Do you work in other fields?

Yes, you're in luck! We work throughout Ukraine.

Do you work with our equipment?
More likely no than yes. We work with our equipment, so we are confident in the quality of our work. But there are always exceptions and we can go to meet our client.

How many kilowatts per m²?

Everything is individual. We will be able to answer this question only after design.

What kind of work experience do you have?

We have over 15 years of experience behind us in this field. You can rest assured of our professionalism.
Do you work in other fields?

Yes, you're in luck! We work throughout Ukraine.

Do you work with our equipment?
More likely no than yes. We work with our equipment, so we are confident in the quality of our work. But there are always exceptions and we can go to meet our client.

How many kilowatts per m²?

Everything is individual. We will be able to answer this question only after design.
Do you have any questions? Ask us
Get a free consultation
By clicking on the button, you agree to the Privacy Policy
Do you have any questions? Ask us
Get a free consultation
By clicking on the button, you agree to the Privacy Policy
© 2021 Opera AG
Contacts
+38 (050) 311 10 23
operaag.info@gmail.com
Address:
02156, Kiev

st. Bratislavska, 14 b